Difference between revisions of "IRobot Energy Saver Project"

From GcatWiki
Jump to: navigation, search
(Dr. Heyer's To Do)
(Dr. Heyer's To Do)
Line 30: Line 30:
 
* Working on camera options. Both groups should continue to keep me posted on their camera requirements.
 
* Working on camera options. Both groups should continue to keep me posted on their camera requirements.
  
* Got maps of Chambers, scale drawings of 2nd [[Media:CHA-A03_scaled.pdf]] and 3rd floor, connected to CAD guy on campus if we need more.
+
* Got maps of Chambers, scale drawings of 2nd [[Media:CHA-A02_scaled.pdf]] and 3rd floor [[Media:CHA-A03_scaled.pdf]], connected to CAD guy on campus if we need more.

Revision as of 16:42, 26 April 2012

Team Pages

Team R2D2
Team Commando

Tools/Packages

Useful Links

General To Do

Dr. Heyer's To Do

  • Working on camera options. Both groups should continue to keep me posted on their camera requirements.